What does an extension cost? Build costs, fees and contingency
As an initial guide, and depending on location, allow around £1,800–£3,400+ per square metre plus VAT for the construction of an extension with standard finishes. VAT at 20% applies to most extension work. Design fees, other consultants and higher-specification finishes are additional, and we recommend holding a contingency of at least 10%.
Why an early figure is only a guide
Construction prices have fluctuated significantly in recent years, and the rate per square metre depends heavily on specification. Published 2026 guidance places single-storey extensions at around £1,800–£3,000 per m² nationally and £2,300–£3,400 in London. An individual project may sit anywhere within that range, or above it.
The factors with the greatest influence on cost are:
- Glazing. Large sliding doors, rooflights and structural glazing add cost quickly.
- Building services. Air source heat pumps, new heating systems and provision for solar panels are integrated systems rather than simple replacements. They require careful planning, adequate space and, in some cases, dedicated housing.
- Kitchens and finishes. Polished, high-end interiors require more time, effort and expense. Wallpaper, specialist paint, bespoke joinery details and premium ironmongery all sit above a standard build allowance.
- Conditions below ground. Ground conditions, foundations, drainage, build-over agreements and the location of incoming services. We recommend ground investigations as early as possible, so that they inform the design and identify hidden issues before they affect cost.
Designing to your budget
The most helpful step a client can take is to share their budget at the outset. Some are hesitant, concerned that it may influence the fee. It does not: our fee reflects the time the design requires, not the size of the budget. Knowing the budget allows us to design accurately and advise realistically.
Our aim is to achieve the brief within the budget wherever possible, testing the design against it as it develops. Sometimes we explore schemes that come in under, on and over budget, so that a client can see what each level of investment achieves. On other occasions, a concept developed without constraint reveals ideas that can be carried into a more economical final design. The approach is always tailored to the client’s objectives.
Once a concept is agreed, we prepare a cost estimate covering the construction cost including the contractor’s overheads and profit, VAT, the consultants required, known risks such as drainage and service connections, and contingency. Some conditions cannot be known until work begins, particularly below ground or within existing structures. Early investigations reduce that uncertainty; the contingency covers what remains.
How design fees are structured
Fees are determined primarily by complexity. Industry guidance places Architects’ fees at around 3–15% of construction cost, with smaller projects typically at the higher end as a percentage.
We begin with a fee for the concept stage, proportionate to the scale of the project. Clients may appoint us for the concept stage alone, agreeing the scheme before committing to the remaining stages, or for the full service from the outset. Once a concept is chosen, the remaining stages can be scoped accurately. Each is allocated an estimated amount of time, defined at the outset, and any additional work requested beyond the agreed scope is charged at an hourly rate. Our appointment is confirmed in a written agreement setting out the scope of service, fees and responsibilities.
A full service typically divides into three broadly equal parts: early design and planning, technical design and tender, and construction through to completion.
The value of contract administration
Contract administration, in which the Architect administers the building contract and inspects the work on site, is the service clients most often consider omitting. Our experience suggests this is rarely a saving. Where clients have instead called on us as needed, the total cost has been comparable to the original appointment. Where projects have proceeded without the Architect’s involvement on site, elements have not always been built to the specification, and resolving the resulting issues has proved difficult.
We design to a fine level of detail: alignments, material selections and the precise position of components. Without the designer’s involvement, a contractor may reasonably take the simplest route, or may not be aware of the detail the design relies upon. Execution is where much of a design’s value is realised.
To discuss the likely cost of your project, get in touch.